Fujian, China
Business Type:
Number of Employees:
Year of Establishment:
OEM/ODM Availability:
OEM/ODM Service
Sample Available
Spanish Speaker

Down The Hole Drill, Drilling Machine for Quarry, Drill Bits manufacturer / supplier in China, offering High Speed Double Hammer Rock Drill for Quarry, Diamond Wire Saw for Stone Block Stationary Tsy-GCP105b, Diamond Wire Saw Machine for Concrete Cutting/Block Cutting-Tsy-37g and so on.

Gold Member Since 2011
Audited Supplier
Supplier Homepage Products Drilling Machine High Speed Double Hammer Rock Drill for Quarry

High Speed Double Hammer Rock Drill for Quarry

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $11,000-15,000/ Set
Port: Fuzhou, China
Production Capacity: 1000set/Year
Payment Terms: L/C, T/T, OA30-60Days
Type: Down-The-Hole Drill
Drill Direction: Vertical
Depth of Drilling: 0-100 M
Drilling Speed: 0-50 M/H
Automation: Automatic
Layout: Vertical

You Might Also Like


Basic Info

Control: Artificial
Precision: High Precision
Application: Mineral Industry, Stone Industry, Granite and Marble Quarry
Certification: ISO, CE, SGS
Number of Hammer: 2
Controlling Mode: Artificial
Hole Diameter: 50-100mm
Trademark: SKYSTONE
Transport Package: Cartons
Specification: 1300kg
Origin: Fuzhou, China
HS Code: 84303900

Product Description

Production introduction:
TSY-RD2 High Speed Double-Hammer Rock Drill
Technical Parameter
Item NoTSY-RD2
Number of Hammer2
Working length of rock drill2.3m
Drilling diameter38mm-45mm
Drilling speed0.5-0.8m/min
Shift travel3m
Air pressure0.5-0.6mpa
Air consumption>=10m3/min
Water pressure0.4Mpa
Water consumption0.5m3*2/h
Whole weight1300kg

It used for block split, and certical, horizontal or slantwise direction drill in stone quarry. The drilling speed is 0.5-0.8m/min.

1. The machien can make vertacal, horizontal or slantwise drilling;
2. The four stilts of machine can be adjusted and fixed separately;
3. The drill is totally pnuematic driven. The rod is cooling by high pressure water, to make sure drilling precision, and reduce the dust from drilling;
4. The air consumption of drill is small and drilling speed is high.

Send your message to this supplier

avatar Mr. Eric Zheng

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now